首页> 外文期刊>Fire Engineering >Testing Pressure-Reducing Valves
【24h】

Testing Pressure-Reducing Valves

机译:测试减压阀

获取原文
获取原文并翻译 | 示例
       

摘要

Every morning at shift change, firefighters throughout North America perform daily apparatus checks and routine maintenance on their equipment. A vital portion of an apparatus check involves operating the pump so that you can depend on it to get water. Generally, this involves engaging the pump, operating the primer, and fully opening every intake and discharge valve while their caps are in place. This "exercises" the valves and facilitates a check of discharge gauges. This is followed by closing the discharge valves and relieving the pressure by operating their respective bleeder valves. Valves are occasionally lubricated to ensure that they will operate easily. No daily pump test would be complete without operating its relief valve or its automatic pressure control governor and the transfer valve on two-stage pumps.
机译:每天早上换班时,北美的消防员每天对其设备进行仪器检查和例行维护。设备检查的重要部分包括操作泵,以便您可以依靠它来取水。通常,这涉及到接合泵,操作底漆并在其盖就位时完全打开每个进排气门。这可以“执行”阀门,并便于检查排放量表。接下来,关闭排放阀并通过操作其各自的泄放阀释放压力。阀门偶尔需要润滑,以确保其易于操作。如果不操作二级泵上的溢流阀或自动压力调节器和输送阀,则每天的泵测试都无法完成。

著录项

  • 来源
    《Fire Engineering》 |2014年第1期|51-525456-61|共9页
  • 作者

    BILL GUSTIN;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:27:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号