首页> 外文期刊>Fire Engineering >Preplanning Your Preconnects
【24h】

Preplanning Your Preconnects

机译:预规划您的预连接

获取原文
获取原文并翻译 | 示例
           

摘要

Next to emergency medical services equipment, precon-nected hoselines are probably the most used equipment on the engine. Yet, when designing and specifying new apparatus, we put preconnects and (especially) crosslays usually where they will fit or where we always put them-on top of the pump module. Unfortunately, because our engines have become larger, requiring more and more storage and featuring larger water tanks, the cross-lays and hosebeds are placed higher and higher in the engines, which presents concerns and safety issues for firefighters who must now reach higher or even step up onto the apparatus when deploying these lines.
机译:除了紧急医疗服务设备之外,预先连接的软管还可能是发动机上使用最多的设备。但是,在设计和指定新设备时,我们通常将预连接件(尤其是交叉件)放在适合它们的位置或始终将它们放置在泵模块的顶部。不幸的是,由于我们的发动机已经变得越来越大,需要越来越多的存储空间,并且配备了更大的水箱,因此交叉放置物和软管床在发动机中的位置越来越高,这给消防员带来了担忧和安全问题,他们现在必须达到更高甚至更高的水平部署这些线路时,请站起来进入设备。

著录项

  • 来源
    《Fire Engineering》 |2015年第6期|1820-2224|共5页
  • 作者

    BOB SHOVALD;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号