首页> 外文期刊>Fire Engineering >JUST ASK ENGINEERING
【24h】

JUST ASK ENGINEERING

机译:只是卖工程

获取原文
获取原文并翻译 | 示例
       

摘要

There are several different tests conducted to ensure a new pump works as desired. The first test is dry vacuum testing to ensure that it holds a vacuum. The pump will be taken to at least a 22 in/Hg (75 kPa) dry vacuum and then watched to see how that vacuum changes over time. That vacuum cannot drop more than 10 in/Hg (34 kPa) in a five-minute time span to be considered passing. The pump would then go through a hydrostatic pressure test to ensure it's structurally capable of containing pressure. Typical hydrostatic pressure tests are done at 500 PSIG (3400 kPa) for a 10-minute time span without any leaks whatsoever for it to be considered passing.
机译:进行了几种不同的测试,以确保新泵根据需要工作。第一次测试是干式真空测试,以确保其保持真空。将泵用于至少22英寸/ hg(75 kPa)干燥真空,然后观看,看看真空如何随时间变化。在5分钟的时间内,真空不能落入超过10英寸/ hg(34kPa)以被认为是通过。然后泵将通过静水压力测试,以确保其在结构上能够含有压力。典型的静水压压力试验以500psig(3400kPa)进行10分钟的时间跨度,而不会被认为是通过的任何泄漏。

著录项

  • 来源
    《Fire Engineering》 |2020年第11期|a5-a5|共1页
  • 作者

    Cory Hutson;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:00:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号