首页> 外文期刊>Expert Systems >Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system, simulated annealing and variable neighbourhood search
【24h】

Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system, simulated annealing and variable neighbourhood search

机译:通过混合max-min ant系统,模拟退火和变量邻域搜索来实现具有顺序依赖的建立时间的混合Flowshop调度

获取原文
获取原文并翻译 | 示例

摘要

This paper deals with the hybrid flowshop scheduling problems with sequence-dependent setup times. To minimize the makespan, we propose hybrid metaheuristic approach, which integrates several features from ant colony optimization, simulated annealing and variable neighbourhood search in a new configurable scheduling algorithm. Our proposed algorithms are tuned by means of design of experiments approach. We present computational experiments on standard test problems and compare the results with the several algorithms presented previously. The results illustrate that the hybrid metaheuristic outperforms the other algorithms.
机译:本文讨论了与顺序相关的建立时间的混合流水车间调度问题。为了最大程度地缩短制造周期,我们提出了一种混合元启发式方法,该方法在新的可配置调度算法中集成了蚁群优化,模拟退火和可变邻域搜索等多项功能。我们提出的算法通过实验方法的设计进行了调整。我们提出了关于标准测试问题的计算实验,并将结果与​​先前提出的几种算法进行了比较。结果表明,混合元启发式算法优于其他算法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号