首页> 外文期刊>Expert systems with applications >An exploratory project expert system for eliciting correlation coefficient and sequential updating of duration estimation
【24h】

An exploratory project expert system for eliciting correlation coefficient and sequential updating of duration estimation

机译:探索相关系数并进行工期估算的顺序更新的探索性项目专家系统

获取原文
获取原文并翻译 | 示例

摘要

This study proposes a framework for updating estimation of project duration in project networks. The first step of building a project expert system is to elicit the correlation coefficient of activity durations from experts' knowledge and intuition. Given the correlation coefficients elicited, the linear Bayesian approach is used to update the distribution of activity duration. In particular, by reflecting the newly observed duration of completed activities, we can update the duration of upcoming activities repeatedly throughout the entire project period. This helps keep track of the constantly changing longest duration path within the networks. Finally, it is shown that all these learning and updating schemes can be relatively easily implemented on an Excel spreadsheet, so that field managers can apply the model into real projects.
机译:这项研究提出了一个框架,用于更新项目网络中项目工期的估算。建立项目专家系统的第一步是从专家的知识和直觉中得出活动持续时间的相关系数。给定得出的相关系数,可使用线性贝叶斯方法来更新活动持续时间的分布。特别是,通过反映新观察到的已完成活动的持续时间,我们可以在整个项目周期内重复更新即将进行的活动的持续时间。这有助于跟踪网络中不断变化的最长持续时间路径。最后,显示了所有这些学习和更新方案都可以在Excel电子表格中相对容易地实现,以便现场经理可以将模型应用于实际项目中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号