Risk identification and assessment for build-operate-transfer projects: A fuzzy multi attribute decision making model

机译:建造-运营-转移项目的风险识别和评估:模糊多属性决策模型

获取原文
获取原文并翻译 | 示例

摘要

In recent years, BOT approach has provided an increasingly popular project financing to move toward infrastructure development in Asian countries such as Iran. There are many complexities in projects because of the variety of factors in project's trend and also the dependence of project on mainly national factors. Due to these complexities and their long-term operating, the projects meet with uncertainty and numerous risks. In this paper, an attempt is made at identifying common risks in BOT projects. A novel hierarchical structure of risks is presented on the basis of the project-oriented point of view; next, some effective criteria for risk ranking in BOT projects are introduced.rnThen, the problem is defined in Fuzzy Multi Attribute Decision Making (FMADM) field. Therefore, Fuzzy Technique for Order Preference by Similarity to Ideal Solution (FTOPSIS) and Fuzzy Linear Programming Technique for Multidimensional Analysis of Preference (FLINMAP) methods are presented in order to rank high risks in BOT projects. In this study, these two methods are compared in four respects: separation among alternatives, fuzzy error in criteria's weights, risk response planning, and numerousness of alternatives in proportion to criteria. The proposed model is used for identifying and assessing risks in Iran BOT power plant project. Finally, the rankings of high risks are determined according to their results at the end of this paper.
机译:近年来,BOT方法提供了越来越受欢迎的项目融资,以朝着伊朗等亚洲国家的基础设施发展迈进。由于项目趋势中各种因素的影响以及项目对主要国家因素的依赖,项目具有许多复杂性。由于这些复杂性及其长期运行,这些项目面临不确定性和众多风险。本文尝试确定BOT项目中的常见风险。基于项目导向的观点提出了一种新颖的风险分层结构。接下来,介绍了BOT项目中风险排名的一些有效标准。然后,在模糊多属性决策(FMADM)字段中定义了该问题。因此,为了在BOT项目中对高风险进行排序,提出了一种类似于理想解决方案的订单偏好模糊技术(FTOPSIS)和一种针对多维偏好分析的模糊线性规划技术(FLINMAP)。在这项研究中,从四个方面对这两种方法进行了比较:备选方案之间的分离,标准权重的模糊误差,风险应对计划以及与标准成比例的多种备选方案。所建议的模型用于识别和评估伊朗BOT电厂项目中的风险。最后,根据本文的结果确定高风险的排名。

著录项

  • 来源
    《Expert systems with applications》 |2010年第1期|575-586|共12页
  • 作者单位

    Department of Industrial Engineering, Islamic Azad University, Karaj Branch, Rajaee Shahr, P.O. Box 31485/313, Karaj, Iran;

    Department of Industrial Engineering, Postgraduate Engineering Center, Islamic Azad University, South Tehran Branch, No. 209,North Iranshahr St., P.O. Box 11365/4435 Tehran, Iran;

    Department of Executive Management, Faculty of Management and Economics, Science and Research Branch,Islamic Azad University, Hesarak St., P 0. Box 14155/4933, Tehran, Iran;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    BOT projects; FMADM; risk identification; risk ranking;