首页> 外文期刊>Expert systems with applications >Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant
【24h】

Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant

机译:具有工作过载最小化和规则性约束的混合模型排序问题的变体建模和求解。日产在巴塞罗那工厂的应用

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, we present an extension to the mixed-model sequencing problem with work overload minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The extension is intended to meet the industrial need to sequence various products so that the work required and completed at the workstations over time is as constant as possible. Several approaches are proposed to formulate the problem, giving rise to different models. Four models are selected, and their performances are compared after running the Gurobi solver, using instances from the literature and a case study of the Nissan powertrain plant in Barcelona.
机译:在本文中,我们为带有串行工作站和并行同类处理器的生产线提供了带有最小工作负荷最小化(MMSP-W)的混合模型排序问题的扩展。该扩展旨在满足对各种产品进行排序的工业需求,以便随着时间的推移,工作站上需要完成的工作尽可能保持不变。提出了几种解决问题的方法,从而产生了不同的模型。选择了四个模型,并使用文献资料和巴塞罗那日产动力总成工厂的案例研究,在运行Gurobi解算器后比较了它们的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号