...
首页> 外文期刊>Expert Systems with Application >Fuzzy parametric programming model for multi-objective integrated solid waste management under uncertainty
【24h】

Fuzzy parametric programming model for multi-objective integrated solid waste management under uncertainty

机译:不确定性下多目标固废综合管理的模糊参数规划模型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Solid waste management is increasingly becoming a challenging task for the municipal authorities due to increasing waste quantities, changing waste composition, decreasing land availability for waste disposal sites and increasing awareness about the environmental risk associated with the waste management facilities. The present study focuses on the optimum selection of the treatment and disposal facilities, their capacity planning and waste allocation under uncertainty associated with the long-term planning for solid waste management. The fuzzy parametric programming model is based on a multi-objective, multi-period system for integrated planning for solid waste management. The model dynamically locates the facilities and allocates the waste considering fuzzy waste quantity and capacity of waste management facility. The model addresses uncertainty in waste quantity as well as uncertainties in the operating capacities of waste management facilities simultaneously. It was observed that uncertainty in waste quantity is likely to affect the planning for waste treatment/disposal facilities more as compared with the uncertainty in the capacities of the waste management facilities. The relationship between increase in waste quantity and increase in the total cost/risk involved in waste management is found to be nonlinear. Therefore, it is possible that a marginal change in waste quantity could increase the total cost/risk substantially. The information obtained from the analysis of modeling results can be effectively used for understanding the effect of changing the priorities and objectives of planning decisions on facility selections and waste diversions.
机译:由于增加了废物数量,改变了废物组成,减少了废物处理场所的土地利用率以及对与废物管理设施有关的环境风险的认识,固体废物管理正日益成为市政当局的一项艰巨任务。本研究着重于处理和处置设施的最佳选择,在与固体废物管理的长期计划有关的不确定性下的容量规划和废物分配。模糊参数规划模型基于多目标,多时期的系统,用于固体废物管理的综合规划。该模型动态地定位设施并考虑模糊的废物数量和废物管理设施的容量来分配废物。该模型同时解决了废物数量的不确定性以及废物管理设施的运营能力的不确定性。据观察,与废物管理设施能力的不确定性相比,废物数量的不确定性更可能影响废物处理/处置设施的规划。发现废物量增加与废物管理涉及的总成本/风险之间的关系是非线性的。因此,废物量的边际变化可能会大大增加总成本/风险。从建模结果分析中获得的信息可以有效地用于理解更改设施选择和废物转移计划决策的优先级和目标的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号