...
首页> 外文期刊>Expert Systems with Application >Multi-mode resource leveling in projects with mode-dependent generalized precedence relations
【24h】

Multi-mode resource leveling in projects with mode-dependent generalized precedence relations

机译:具有模式相关的广义优先关系的项目中的多模式资源平衡

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In real-life project management, resource leveling is an important technique to ensure the effective use of resources, in which activities (a) can often be executed in alternative modes and (b) are constrained by precedence relations with minimum and maximum time lags that can be modeled using generalized precedence relations (GPRs). In addition, the values of the time lags tend to depend on activity modes. The resource leveling problem with multiple modes and mode-dependent GPRs (MRLP-GPR) is a generalization of the classic NP-hard resource leveling problem. To our knowledge, no literature exists regarding the MRLP-GPR.
机译:在现实生活中的项目管理中,资源均衡是确保资源有效利用的一项重要技术,其中活动(a)经常可以以其他方式执行,并且(b)受到优先级关系的限制,具有最小和最大时滞,可以使用广义优先关系(GPR)建模。另外,时滞的值往往取决于活动模式。具有多种模式和与模式相关的GPR(MRLP-GPR)的资源均衡问题是经典NP硬资源均衡问题的概括。据我们所知,没有关于MRLP-GPR的文献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号