首页> 外文期刊>Environmental Technology >ESTIMATING POLLUTANT REMOVAL REQUIREMENTS FOR LANDFILLS IN THE UK: I. BENCHMARK STUDY AND CHARACTERISTICS OF WASTE TREATMENT TECHNOLOGIES
【24h】

ESTIMATING POLLUTANT REMOVAL REQUIREMENTS FOR LANDFILLS IN THE UK: I. BENCHMARK STUDY AND CHARACTERISTICS OF WASTE TREATMENT TECHNOLOGIES

机译:估算英国垃圾填埋的污染物去除要求:I.基准研究和废物处理技术的特征

获取原文
获取原文并翻译 | 示例
       

摘要

Introduction of the EU Landfill Directive is having a significant impact on waste management in the UK and in other member states that have relied on landfilling. This paper considers the length of the aftercare period required by the municipal solid waste streams that the UK will most probably generate following implementation of the Landfill Directive. Data were derived from literature to identify properties of residues from the most likely treatment processes and the probable management times these residues will require within the landfill environment were then modelled. Results suggest that for chloride the relevant water quality standard (250 mg l~(-1)) will be achieved with a management period of 40 years and for lead (0.1 mg l~(-1)), 240 years. This has considerable implications for the sustainability of landfill and suggests that current timescales for aftercare of landfills may be inadequate.
机译:欧盟垃圾填埋指令的出台对英国和其他依赖垃圾填埋的成员国的废物管理产生了重大影响。本文考虑了英国在实施《垃圾填埋指令》后最有可能产生的城市固体废物流所要求的后期维护时间。数据来源于文献,以鉴定最可能的处理过程中残留物的性质,然后对这些残留物在垃圾填埋场环境中所需的可能管理时间进行建模。结果表明,氯化物的相关水质标准(250 mg l〜(-1))的管理期限为40年,铅(0.1 mg l〜(-1))的管理期为240年。这对垃圾填埋场的可持续性具有相当大的影响,并表明目前进行垃圾填埋场后期维护的时间表可能不足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号