首页> 外文期刊>Environmental Management >A Standardized Procedure for a Pre-evaluation of the IED Instance
【24h】

A Standardized Procedure for a Pre-evaluation of the IED Instance

机译:IED实例预评估的标准化程序

获取原文
获取原文并翻译 | 示例
       

摘要

This study presents a procedure, called EICS (Enterprise IPPC Compatibility Study) aimed at evaluating, by means of the calculation of three indexes, the compliance of the processes performed in an industrial plant with the guidelines provided by BREFs (BAT References) Documents. In fact, according to European Directive 2010/ 75/EU (concerning the Integrated Pollution Prevention and Control and repealing European Directive 2008/0 I/EC), industrial plants must require authorizations to the competent authority stating the conformity of their activity, in order to obtain this conformity they are advised to Best Available Technologies (BAT). The aim of the BATs is to avoid or minimize the impact of an industrial activity on the environment through the prevention of the atmospheric emissions, wastewater discharge and energetic consumption, and the correct waste management thus improving the efficiency of the plant. The procedure shown in the present paper has been tested on several types of industrial plant (cement plants, secondary smelt foundries, paper-mill, and automotive industries as regards their paint lines). In this paper, the application of EICS method to a cement plant is presented: the obtained results highlight a good correlation between the index values and the real situation of the plant.
机译:这项研究提出了一种称为EICS(企业IPPC兼容性研究)的程序,旨在通过计算三个指标来评估工业厂房中执行的过程是否符合BREF(BAT参考)文档提供的指南。实际上,根据欧洲指令2010/75 / EU(关于综合污染预防和控制并废除欧洲指令2008/0 I / EC),工厂必须获得主管当局的授权,说明其活动的符合性,以便为获得此一致性,建议他们与最佳可用技术(BAT)取得联系。最佳可行技术的目的是通过防止大气排放,废水排放和高能消耗以及正确的废物管理,从而避免或减少工业活动对环境的影响,从而提高工厂的效率。本文中显示的过程已在几种类型的工厂(水泥厂,二次冶炼铸造厂,造纸厂和汽车工业的涂装线)上进行了测试。本文介绍了EICS方法在水泥厂中的应用:所获得的结果突显了指标值与水泥厂实际情况之间的良好相关性。

著录项

  • 来源
    《Environmental Management》 |2016年第4期|847-855|共9页
  • 作者单位

    DIATI (Department of Engineering for Environment, Land and Infrastructures), Politecnico di Torino, Corso Duca degli Abruzzi, 24, 10129 Turin, Italy;

    DIATI (Department of Engineering for Environment, Land and Infrastructures), Politecnico di Torino, Corso Duca degli Abruzzi, 24, 10129 Turin, Italy;

    DIATI (Department of Engineering for Environment, Land and Infrastructures), Politecnico di Torino, Corso Duca degli Abruzzi, 24, 10129 Turin, Italy;

    DIATI (Department of Engineering for Environment, Land and Infrastructures), Politecnico di Torino, Corso Duca degli Abruzzi, 24, 10129 Turin, Italy;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Integrated environmental authorization; Best available technologies; Industrial plant; Environmental impact; Weight and score;

    机译:综合环境授权;最佳可用技术;工业厂房;对环境造成的影响;体重和分数;
  • 入库时间 2022-08-17 13:25:53

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号