【24h】

No bridge too far

机译:没有桥梁太远

获取原文
获取原文并翻译 | 示例
           

摘要

Highway maintenance authorities in both Europe and America are faced with the increasingly complex dilemma of balancing maintenance prioritisation with tumbling budgets. As much of the infrastructure is ageing considerably, the maintenance challenges are becoming more critical, with many potentially disastrous defects being hidden well below the road surface. Elevated sections and bridge decks in particular are prone to problems of delamination and corrosion of steel reinforcement bars. Inspecting for these defects has traditionally been achieved using coring and sampling the road, a technique which suffers from four significant problems: 1. Disruption - While samples are taken and repairs made, the section of the road needs to be closed. 2. Speed - The process is slow, requiring samples to be collected and laboratory analysis to be performed.
机译:欧美的公路养护当局都面临着日益复杂的两难困境,那就是在养护工作的优先次序与预算的不断下降之间取得平衡。随着许多基础设施的严重老化,维护挑战变得越来越严峻,许多潜在的灾难性缺陷隐藏在路面下方。特别是高架部分和桥面容易出现钢筋分层和腐蚀的问题。传统上,使用道路取芯和采样来检查这些缺陷,该技术存在四个严重问题:1.中断-在进行采样和维修时,必须关闭路段。 2.速度-过程缓慢,需要收集样品并进行实验室分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号