首页> 外文期刊>Environmental engineering >Workhorse of the skies?
【24h】

Workhorse of the skies?

机译:天空的主力军?

获取原文
获取原文并翻译 | 示例
           

摘要

Energy pipelines are mainly buried. Damage may occur during land-clearing, construction, or farming work. The Right Of Way Automated Monitoring (RAM) Project, is looking at innovative technologies to improve and automate pipeline monitoring in the US and internationally. The goal is to use aerial surveillance through unmanned aircraft to provide continuous, real-time detection and reporting of pipeline integrity. The first test flight using a fixed-wing unmanned aircraft to inspect an energy pipeline route - with a piloted chase helicopter to ensure safety beyond the ground observers' sight line - was completed in March. The flight lasted 90 minutes and covered about 11 miles over a Colonial Pipeline Company right of way near Fork Union in rural Virginia.
机译:能源管道主要埋在地下。在开荒,建设或耕种工作期间可能会发生损坏。道路通行自动监控(RAM)项目正在研究创新技术,以改善和自动化美国和国际上的管道监控。目标是通过无人飞机进行空中监视,以提供连续,实时的管道完整性检测和报告。 3月完成了使用固定翼无人飞机检查一条能源管道路线的首次试飞,并使用了无人驾驶追逐直升机来确保地面观察者视线之外的安全。飞行持续了90分钟,在弗吉尼亚州乡村的福克联盟附近的殖民地管道公司上空飞行了约11英里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号