...
首页> 外文期刊>Environmental engineering >Wave test site set for port in Cornwall
【24h】

Wave test site set for port in Cornwall

机译:康沃尔港口的波浪测试现场

获取原文
获取原文并翻译 | 示例
           

摘要

A "nursery" testing site for wave energy devices is to be set up in Falmouth Bay on the south coast of Cornwall following an agreement between the Falmouth Harbour Commissioners (FHC) and the Crown Estate. The FabTest facility, which will not be connected to the grid, is intended as a first stage site for testing wave energy systems that might later be deployed at the Wave Hub grid-connected demonstration facility on Cornwall's north coast. The new site has also been issued with a marine licence by the Marine Management Organisation, which allows the mooring of up to three marine energy converter devices. It will be managed by a partnership between FHC and the University of Exeter.
机译:根据法尔茅斯港专员(FHC)和王室庄园的协议,将在康沃尔郡南海岸的法尔茅斯湾建立一个波浪能设备的“托儿所”测试地点。 FabTest设施将不会连接到电网,旨在作为测试波浪能系统的第一阶段站点,该系统以后可能会在康沃尔郡北海岸的Wave Hub并网示范设施中部署。新地点还获得了美国海洋管理组织(Marine Management Organisation)的海洋许可,可以最多系泊三个海洋能转换装置。它由FHC和埃克塞特大学之间的合作关系管理。

著录项

  • 来源
    《Environmental engineering》 |2011年第4期|p.4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号