...
首页> 外文期刊>Environment reporter >Buyer of Former Baltimore Steel Mill Pledges Over $48 Million for Cleanup of Site
【24h】

Buyer of Former Baltimore Steel Mill Pledges Over $48 Million for Cleanup of Site

机译:前巴尔的摩钢铁厂的买家承诺为清理场地提供超过4,800万美元的资金

获取原文
获取原文并翻译 | 示例

摘要

The new owner of the former Sparrows Point steel-making facility near Baltimore has pledged over $48 million to ensure cleanup of historic contamination of the property with an eye toward redeveloping the 3,100-acre site into a transportation and manufacturing "economic engine." The commitment is spelled out in a 120-page administrative consent order with the Maryland Department of the Environment that took effect Sept. 18-the date when Sparrows Point Terminal LLC (SPT) bought the site from its most recent owner, Sparrows Point LLC, one of a succession of owners that have come and gone since longtime operator Bethlehem Steel ended its 87-year run there in 2003.
机译:巴尔的摩附近的前麻雀角炼钢厂的新所有者已承诺提供超过4,800万美元的资金,以确保清理该物业的历史污染,并着眼于将该3,100英亩的场地重建为运输和制造“经济引擎”。这项承诺在与马里兰州环境部的120页行政许可命令中得到了明确说明,该命令于9月18日生效,即Sparrows Point Terminal LLC(SPT)从其最新所有者Sparrows Point LLC购买该网站的日期,自长期运营商伯利恒钢铁公司(Bethlehem Steel)在2003年结束了长达87年的运营以来,这是一连串的船东。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号