首页> 外文期刊>Engineering >Productivity Testing Design Method of Multi-Factor Control for Unconsolidated Sandstone Gas Reservoir
【24h】

Productivity Testing Design Method of Multi-Factor Control for Unconsolidated Sandstone Gas Reservoir

机译:疏松砂岩气藏多因素控制生产率测试设计方法

获取原文
获取原文并翻译 | 示例
           

摘要

Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, pipe string type and sea area, the required minimum testing flow rate during cleaning up process, as well as minimum test flow rate without hydrate generation, pipe string erosion critical production, the maximum testing flow rate without destroying sand formation and the minimum output of meeting the demand of development was analyzed; based on the above critical test flow rates, testing working system is designed. Field application showed that the designed work system effectively provided good guidance for field test operations; no sand production or hydrate generation happened during the test process; the test parameter evaluated the reservoir accurately; the safe and efficient test operation was achieved.
机译:在深水非固结砂岩气井测试工作系统中应考虑的关键因素是储层安全性,测试管柱安全性和流量控制。结合测试油藏,管柱类型和海域的特点,清理过程中所需的最小测试流速,以及不产生水合物的最小测试流速,关键的管柱腐蚀生产,最大的测试流速而不会破坏分析了沙的形成和满足发展需求的最低产量;基于以上关键测试流量,设计了测试工作系统。现场应用表明,所设计的工作系统有效地为现场测试操作提供了良好的指导。在测试过程中没有产生沙粒或生成水合物;测试参数准确评估了储层;安全有效的测试操作得以实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号