...
首页> 外文期刊>Engineering technology >Advanced power supply equipment for a new aluminium smelter potline
【24h】

Advanced power supply equipment for a new aluminium smelter potline

机译:新型铝熔炉生产线的先进电源设备

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A new potline installed by the Icelandic Aluminium Company (ISAL) at its Straumsvik smelter has increased the production capacity of the plant by 62%. This article describes the electrical system behind this project. To increase capacity and give it a competitive edge in the marketplace, the Icelandic Aluminium Company (ISAL) recently added a third potline to its smelter at Straumsvik, Iceland. Start-up of the new line, which has 160 pots, has increased the annual production capacity of the plant by 62,000 tonnes. The electric power supply system for potline 3 was designed, manufactured and installed by ABB in close co-operation with the Iceland Project Management Team (IPM) and the National Power Company (NPC). ALESA Alusuisse Engineering Ltd and ISAL drew up the specifications for the power supply.
机译:冰岛铝业公司(ISAL)在其Straumsvi​​k冶炼厂安装的新生产线使该工厂的生产能力提高了62%。本文介绍了此项目背后的电气系统。为了提高产能并使其在市场上具有竞争优势,冰岛铝业公司(ISAL)最近为其位于冰岛Straumsvi​​k的冶炼厂增加了第三条电解槽。新生产线的启动有160个盆,使该厂的年生产能力增加了62,000吨。 ABB与冰岛项目管理团队(IPM)和国家电力公司(NPC)密切合作,设计,制造和安装了3号输水管道的电源系统。 ALESA Alusuisse Engineering Ltd和ISAL制定了电源规格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号