...
首页> 外文期刊>Engineering Structures >Experimental and analytical investigation of end zone cracking in BT-78 girders
【24h】

Experimental and analytical investigation of end zone cracking in BT-78 girders

机译:BT-78大梁末端区域开裂的实验和分析研究

获取原文
获取原文并翻译 | 示例
           

摘要

In the past decade, with a growing interest in long span bridge girders, designers are using an increasing number of prestressing strands. This scaling up has led to cracking issues in the end zone of narrow stemmed bulb-tees and I-girders, impacting the service life and possibly design capacities in case of excessive cracking. In a project funded by the Alabama department of transportation (DOT), a 180 ft long girder design was developed by modifying a standard Bulb-Tee girder and using a 10 ksi self consolidating concrete mix. The new girder is 78 in. deep and has 66-0.6 in. strands. The impact of the draping angle and debonding on the end zone cracking was first evaluated using a 3 D finite element model (FEM) developed in ABAQUS. Subsequently, the critical stresses were monitored during the detensioning process of four 54 ft long full-scale girders with different end zone details. It was found that the combination of limiting the draping angle and debonding the strands resulted in minimizing the end zone cracking. The detailed FEA model which was developed is also verified using experimental field data. The results of this experimental and analytical investigation will be presented in this paper. (C) 2017 Elsevier Ltd. All rights reserved.
机译:在过去的十年中,随着人们对大跨度桥梁的兴趣不断增长,设计人员正在使用越来越多的预应力钢绞线。这种扩大导致狭窄的球茎T型和I型梁的端部区域出现开裂问题,从而影响使用寿命,并在出现过多开裂的情况下可能影响设计能力。在阿拉巴马州交通运输部(DOT)资助的一个项目中,通过修改标准的Bulb-Tee大梁并使用10 ksi自固结混凝土混合物来开发180英尺长的大梁设计。新梁的深度为78英寸,股线为66-0.6英寸。首先使用在ABAQUS中开发的3D有限元模型(FEM)评估悬垂角和剥离对端部区域开裂的影响。随后,在四个具有不同端部区域细节的54英尺长的全尺寸大梁的张紧过程中监测了临界应力。已经发现,限制悬垂角和使股线脱粘的组合导致最小化了端部区域开裂。还使用实验现场数据验证了开发的详细FEA模型。该实验和分析研究的结果将在本文中介绍。 (C)2017 Elsevier Ltd.保留所有权利。

著录项

  • 来源
    《Engineering Structures》 |2017年第15期|503-517|共15页
  • 作者单位

    Univ Alabama, Dept Civil Construct & Environm Engn, Box 870205, Tuscaloosa, AL 35487 USA;

    Univ Alabama, Dept Civil Construct & Environm Engn, Box 870205, Tuscaloosa, AL 35487 USA|MBA Engineers Inc, 300-20th St St North,Suite 100, Birmingham, AL 35303 USA;

    Univ Alabama, Dept Civil Construct & Environm Engn, Box 870205, Tuscaloosa, AL 35487 USA;

    Univ Alabama, Dept Civil Construct & Environm Engn, Box 870205, Tuscaloosa, AL 35487 USA;

    Univ Alabama, Dept Civil Construct & Environm Engn, Box 870205, Tuscaloosa, AL 35487 USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Prestressed concrete girders; End zone cracking; Transfer length; Bulb-tee; Finite element modelling;

    机译:预应力混凝土梁;端部开裂;传输长度;球三通;有限元建模;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号