首页> 外文期刊>Engineering news-record >Long-Lasting Overlay Stops Winter Parking Lot Damage
【24h】

Long-Lasting Overlay Stops Winter Parking Lot Damage

机译:持久的覆盖物可防止冬季停车场受损

获取原文
获取原文并翻译 | 示例
       

摘要

For the first time in years, snow removal equipment did no damage to this Utah State University parking lot. It was protected by E-Krete~® Long-Lasting Overlay during the 2012-2013 winter. "We had no damage from ice and snow and no damage from the heavy snow removal equipment used to clear it," says Quin E. Whitaker, PE, MBA, the university's structural engineer/ project manager. "The E-Krete~®-protected pavement experienced temperatures this winter as low as -20°F and constant traffic from snow and ice removal equipment."
机译:多年来,除雪设备对这家犹他州立大学的停车场没有造成任何损坏。在2012-2013年冬季,它受到E-Krete〜®持久覆盖的保护。该大学的结构工程师/项目经理,PE,MBA,Quin E. Whitaker说:“我们没有受到冰雪的破坏,也没有因清除积雪而使用的大雪清除设备造成的破坏。” “受E-Krete〜®保护的路面在今年冬天的温度低至-20°F,并且除雪和除冰设备的流量不断。”

著录项

  • 来源
    《Engineering news-record》 |2013年第1期|88-88|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:42

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号