首页> 外文期刊>Engineering news-record >Boston's Callahan Tunnel Set For 3-Month Rehab Closure
【24h】

Boston's Callahan Tunnel Set For 3-Month Rehab Closure

机译:波士顿的Callahan隧道将关闭3个月

获取原文
获取原文并翻译 | 示例
       

摘要

Boston's Callahan Tunnel, which connects the city's North End to Logan International Airport and state Route 1A in East Boston, will close for three months for rehabilitation beginning in December, the Massachusetts Dept. Transportation announced last month. The $34.9-million project, out for bid on June 29, includes the rehabilitation of the 52-year-old tunnel's deck, curb line and gutters and replacement of its wall panels, according to MassDOT. Also, testing will be done on the existing adhesive anchors supporting the ceiling panels.
机译:上个月马萨诸塞州交通部宣布,连接城市北端与洛根国际机场和东波士顿1A号州际公路的波士顿Callahan隧道将关闭三个月,从12月开始恢复。据MassDOT称,这个耗资3490万美元的项目将于6月29日竞标,其中包括修复已有52年历史的隧道的甲板,路缘线和排水沟以及更换其墙板。另外,将在支撑天花板的现有粘合剂锚上进行测试。

著录项

  • 来源
    《Engineering news-record》 |2013年第1期|14-14|共1页
  • 作者

    Fohanna Knapschaefer;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号