首页> 外文期刊>Engineering news-record >DOE's Cleanup Woes Aired Anew
【24h】

DOE's Cleanup Woes Aired Anew

机译:美国能源部的清理工作重新开始

获取原文
获取原文并翻译 | 示例
       

摘要

A June 27 Senate subcommittee hearing spotlighted the difficulties with contracts for nuclear-waste cleanup under the Energy Dept.'s Office of Environmental Management (EM). Claire McCaskill (D-Mo.), the chairwoman of the Subcommittee on Financial and Contracting Oversight, highlighted the problems at legacy sites, saying, "Unfortunately for the taxpayer, for EM's large contracts, cost overruns, schedule delays and technical failures are the rule, not the exception." For example, the cost of the Salt Waste Processing Facility (SWPF) at the Savannah River site, near Aiken, S.C., has increased to $1.2 billion from an original estimate of $340 million, she said.
机译:在6月27日的参议院小组委员会听证会上,能源部环境管理办公室(EM)的核废料清理合同遇到了困难。财务和合同监督小组委员会主席克莱尔·麦卡斯基尔(D-Mo。)强调了旧址的问题,他说:“对于纳税人来说,不幸的是,EM的大合同,成本超支,工期延误和技术故障是最主要的问题。规则,也不例外。”她说,例如,位于南卡罗来纳州艾肯附近的萨凡纳河(Savannah River)场的盐废物处理设施(SWPF)的成本已从最初的3.4亿美元增加到12亿美元。

著录项

  • 来源
    《Engineering news-record》 |2013年第1期|12-12|共1页
  • 作者

    Pam Hunter;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号