首页> 外文期刊>Engineering news-record >Funding Collapses for $3.6B Columbia River Crossing
【24h】

Funding Collapses for $3.6B Columbia River Crossing

机译:资金折叠为$ 3.6B哥伦比亚河道口

获取原文
获取原文并翻译 | 示例
       

摘要

Funding problems have brought down a planned 10-lane, $3.6-billion project for a Pacific Northwest Interstate 5 bridge that included a replacement span over the Columbia River, connecting Portland, Ore., with Vancouver, Wash. Washington state lawmakers failed to pass a $10-billion transportation package as part of a new two-year budget, which included funding to keep the Columbia River Crossing project going. In light of this, Oregon Gov. John Kitzhaber (D) scrapped the project, a decade-old plan that had nearly 100 employees working on it and already cost $170 million.
机译:资金问题使计划中的10车道,36亿美元的太平洋西北5号州际公路大桥项目无法实现,该项目包括跨接哥伦比亚河,连接俄勒冈州波特兰市与华盛顿州温哥华市的跨度。华盛顿州议员未能通过作为新的两年期预算的一部分,100亿美元的交通运输计划包括保持哥伦比亚河穿越项目继续进行的资金。有鉴于此,俄勒冈州州长约翰·基扎伯(John Kitzhaber)取消了这个项目,这项计划已有十年历史,该计划已有近100名员工在进行,并且已经花费了1.7亿美元。

著录项

  • 来源
    《Engineering news-record》 |2013年第1期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号