首页> 外文期刊>Engineering news-record >Polar Vortex Spins Blackouts Through Canadian Province
【24h】

Polar Vortex Spins Blackouts Through Canadian Province

机译:Polar Vortex在加拿大省范围内停电

获取原文
获取原文并翻译 | 示例
       

摘要

Rolling blackouts and power outages throughout Canada's Newfoundland and Labrador province in January have prompted the Board of Commissioners of Public Utilities (PUB) to launch a probe into Nalcor Energy and its management of power generation and transmission infrastructure. PUB's announcement of the investigation comes after a number of public complaints claimed that utility corporations Nalcor and Newfoundland and Labrador Hydro had focused all their development efforts on the approximately $7.8-billion Muskrat Falls hydropower project, now under construction, while neglecting crucial, existing infrastructure.
机译:一月份,加拿大纽芬兰省和拉布拉多省不断出现停电和停电事件,促使公用事业委员会(PUB)发起了对Nalcor Energy及其发电和输电基础设施管理的调查。 PUB宣布进行这项调查之前,许多公众投诉称,公用事业公司Nalcor,Newfoundland和Labrador Hydro将所有开发工作都集中在了目前正在建设中的约78亿美元的Muskrat Falls水电项目上,而忽略了关键的现有基础设施。

著录项

  • 来源
    《Engineering news-record》 |2014年第2期|14-14|共1页
  • 作者

    Nicholas Zeman;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:58

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号