Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling

机译:通过系统动力学建模研究初始范围的建立对项目绩效的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Traditional construction procurement is generally used for projects with no unusual features and a well-established scope. In this method, work progresses sequentially because each step is completed before the next step is started. As such, making changes during construction is problematic and expensive. Design and build (D/B) method allows the client to introduce the contractor's design at any stage resulting in the possibility of having different levels of initial scope establishment. Consequently, the project can gain benefit through buildability and the integration of design and construction. The client's main criteria for selecting D/B procurement are to reduce the time and cost of projects through one point responsibility.
机译:传统的建筑采购通常用于没有特殊特征且范围明确的项目。在这种方法中,由于每个步骤都在下一步开始之前完成,因此工作按顺序进行。因此,在施工期间进行更改是有问题且昂贵的。设计和建造(D / B)方法允许客户在任何阶段介绍承包商的设计,从而可能具有不同级别的初始范围建立。因此,该项目可以通过可构建性以及设计与施工的集成获得收益。客户选择D / B采购的主要标准是通过一站式责任来减少项目的时间和成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号