...
首页> 外文期刊>Engineering, Construction and Architectural Management >The unmanageability of construction and the theoretical psycho-social dynamics of projects
【24h】

The unmanageability of construction and the theoretical psycho-social dynamics of projects

机译:建设的不可管理性和项目的理论社会心理动力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The article 'researches' construction fragmentation from the assumption that construction projects are 'unmanageable' (Mintzberg, 1982) in conventional terms, in an attempt to give thematic unity to this problem. Socio-technical analysis which underlay the Building Industry Communications Research Project (BICRP) (Higgin & Jessop, 1963, 1965; TIHR, 1965; Chrichton, 1966) conducted by the Tavistock Institute for Human Relations (TIHR) from 1963 to 1965 is explored and developed, supplemented by other relevant authors. The argument is conducted formally without reference to particular examples and develops the debate provoked by Connaughton (2000).
机译:这篇文章以传统意义上的建筑项目“无法管理”的假设“研究”建筑碎片(Mintzberg,1982),目的是使这个问题在主题上统一。由塔维斯托克人际关系研究所(TIHR)在1963年至1965年进行的建筑技术交流研究项目(BICRP)(Higgin&Jessop,1963,1965; TIHR,1965; Chrichton,1966)的社会技术分析得到了探索和探索开发,并由其他相关作者进行补充。该论证是正式进行的,没有参考具体的例子,并引发了康诺顿(2000)引起的辩论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号