首页> 外文期刊>Engineering construction & architectural management >Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA
【24h】

Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA

机译:在施工过程的早期设计阶段开发基于客户的风险管理方法:已应用于KSA

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose - The risk factors associated with clients have a major impact on the successful delivery of a project from early design to the construction and operation stages. Risk management studies conducted so far have not succeeded in providing an effective risk assessment methodology for clients in analysing and managing the risk factors that cause both project delays and cost overruns. So, the purpose of this paper is to provide a methodology for a client-based risk management model. Design/methodology/approach - A conceptual framework is designed by integrating the findings from a literature review and a construction industry survey in the Kingdom of Saudi Arabia. The framework includes the risk identification, risk analysis and mitigation strategy, which are the key components of the model. The model of the framework is developed by integrating the analytical hierarchy process (AHP) and Monte Carlo simulation (MCS) underpinned within an @Risk program. Findings - A case study is used to demonstrate the proposed methodology; the results found that the model helps to analyse and quantify the impact of risk factors, and also to assist in taking a suitable risk mitigation strategy, particularly at the early design stage in the construction process. Practical implications - The model is applicable to both public and private clients when they need to know the possible project duration in a new construction project, and to take some proactive actions to avoid the adverse effect of client risk factors at the early stage of the project. Originality/value - The model is expected to help in understanding the nature, and analysing the influence, of client risk factors that cause project delays and cost overruns. The development of the methodology for managing the client-based risk in construction processes at the early design stage is the key value of the study.
机译:目的-与客户相关的风险因素对从早期设计到施工和运营阶段的项目成功交付产生重大影响。迄今为止进行的风险管理研究未能成功地为客户提供有效的风险评估方法,以分析和管理导致项目延误和成本超支的风险因素。因此,本文的目的是为基于客户的风险管理模型提供一种方法。设计/方法/方法-通过整合来自沙特阿拉伯王国的文献综述和建筑业调查的结果来设计概念框架。该框架包括风险识别,风险分析和缓解策略,这是模型的关键组成部分。该框架的模型是通过集成支持@Risk程序的分析层次结构过程(AHP)和蒙特卡洛模拟(MCS)来开发的。调查结果-通过案例研究来证明所提出的方法;结果发现,该模型有助于分析和量化风险因素的影响,还有助于采取适当的风险缓解策略,尤其是在施工过程的早期设计阶段。实际意义-该模型适用于公共和私人客户,当他们需要了解新建筑项目的可能项目工期,并需要采取一些积极行动来避免项目早期阶段客户风险因素的不利影响时。原创性/价值-该模型有望帮助理解导致项目延误和成本超支的客户风险因素的性质,并分析其影响。在设计的早期阶段开发用于管理施工过程中基于客户的风险的方法是该研究的关键价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号