首页> 外文期刊>Engineering, Construction and Architectural Management >Enterprise risk management in international construction firms: drivers and hindrances
【24h】

Enterprise risk management in international construction firms: drivers and hindrances

机译:国际建筑公司的企业风险管理:驱动因素和障碍

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The specific purposes of this paper are: to identify the critical drivers for and hindrances to enterprise risk management (ERM) implementation; and to compare the influence of these factors on ERM implementation between large and small-medium (SM) Chinese construction firms (CCFs) in Singapore. Design/methodology/approach - A questionnaire survey was conducted and responses were received from 35 experienced managers in CCFs operating in Singapore. Findings - A total of 13 drivers and 22 hindrances were found critical to ERM implementation in Singapore-based CCFs. "Improved decision making" were the top influential driver, while "insufficient resources (e.g. time, money, people, etc.)" were the most significant hindrances. Additionally, despite significant differences in the mean scores of seven drivers and four hindrances, the large and SM CCFs agreed on the rankings of drivers and hindrances, respectively. Research limitations/implications - As the survey was performed with the Singapore-based CCFs, there may be geographical limitation on the identification of the critical drivers for and hindrances to ERM implementation. The sample size was still small, despite a relatively high response rate. Practical implications - The findings of this study allow the management to strengthen the positive influence from the drivers and overcome the challenges posed by the significant hindrances. Originality/value - Despite studies on ERM in various industries, few studies have attempted to disclose the factors driving and hindering ERM implementation in construction firms. Thus, this study expands the existing literature relating to ERM. An understanding of the drivers for ERM implementation enables the management to obtain sufficient support for the ERM program and strengthen the positive influence from the drivers. The identification of the hindrances allows the management to be clear about the challenges faced by the ERM program and take measures to diminish their negative influence and overcome them. Additionally, other construction firms can use the drivers and hindrances identified in this study to prepare their customized list of drivers and hindrances.
机译:目的-本文的具体目的是:确定企业风险管理(ERM)实施的关键驱动因素和障碍;并比较这些因素对新加坡大型和中型(SM)建筑企业(CCF)之间实施企业风险管理的影响。设计/方法/方法-进行了问卷调查,并收到了在新加坡运营的CCF中35位经验丰富的经理的答复。调查结果-发现总共13个驱动因素和22个障碍对总部位于新加坡的CCF实施企业风险管理至关重要。最有影响力的因素是“决策能力得到改善”,而最主要的障碍是“资源不足(例如时间,金钱,人员等)”。此外,尽管七个驾驶员和四个障碍的平均得分存在显着差异,但大型CCF和SM CCF分别同意了驾驶员和障碍的排名。研究的局限性/意义-由于该调查是通过总部位于新加坡的CCF进行的,因此在确定企业风险管理实施的关键驱动因素和障碍方面可能存在地域限制。尽管响应率相对较高,但样本量仍然很小。实际意义-这项研究的结果使管理层能够增强驱动因素的积极影响并克服重大障碍带来的挑战。原创性/价值-尽管对各个行业的企业风险管理进行了研究,但很少有研究试图揭示推动和阻碍建筑企业实施企业风险管理的因素。因此,本研究扩展了有关ERM的现有文献。对ERM实施动因的理解使管理层能够为ERM计划获得足够的支持,并增强动因的积极影响。识别障碍可以使管理层清楚了解企业风险管理计划所面临的挑战,并采取措施减少其负面影响并加以克服。另外,其他建筑公司可以使用本研究中确定的驱动因素和障碍来准备其定制的驱动因素和障碍清单。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号