首页> 外文期刊>Engineering, Construction and Architectural Management >Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia An empirical assessment
【24h】

Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia An empirical assessment

机译:沙特阿拉伯的机械,电力和管道项目的项目采购系统实证评估

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The purpose of this paper is to investigate the empirical relationship between mechanical, electrical, and piping (MEP) project procurement systems and project performance in the context of the Saudi Arabian construction industry. The study plans to expand the understanding of the relationship of design-bid-build (DBB) and design-build (DB) performance with respect to change order rate, cost growth, and schedule growth. Design/methodology/approach - The paper statistically analyzed 207 MEP projects. It investigates the relationship of project procurement systems and three project performance indicators. Hypotheses testing was used to assess the relationship. Findings - The results show that projects using the DB procurement system are more likely to have less cost overrun and experience a lower change order rate compared to DBB for pricing and selection methods, yet neither procurement system had an advantage over the schedule duration based on the study's sample. Research limitations/implications - The lack of information identifying the cause of contract change orders limits the interpretation of the findings. Sample sizes in some of the test criteria were statistically small, thus limiting the reliability or confidence level of the analysis for those samples. Caution should be used when interpreting the results as representative of the Saudi Arabian construction industry as a whole; due to the owner's project execution policies, procedures, and standards, the level of enforcement of those practices may differ from other owners. Originality/value - The paper fulfills and identified the relationship between the project procurement system and MEP project performance in the context of the Saudi Arabian construction industry.
机译:目的-本文的目的是在沙特阿拉伯建筑业的背景下研究机械,电气和管道(MEP)项目采购系统与项目绩效之间的经验关系。该研究计划扩大对变更订单率,成本增长和进度增长方面的设计投标构建(DBB)和设计构建(DB)性能之间关系的理解。设计/方法/方法-本文对207个MEP项目进行了统计分析。它调查了项目采购系统与三个项目绩效指标之间的关系。假设检验用于评估这种关系。调查结果-结果显示,与DBB相比,使用DB采购系统的项目更有可能减少成本超支并降低变更单率,但两种定价方式都没有采购系统在进度期限上具有优势研究的样本。研究的局限性/含义-缺乏确定合同变更单原因的信息,限制了对结果的解释。一些测试标准中的样本量在统计上较小,因此限制了这些样本的分析可靠性或置信度。在将结果解释为整个沙特阿拉伯建筑业的代表时应谨慎行事;由于所有者的项目执行政策,程序和标准,这些实践的执行水平可能与其他所有者不同。原创性/价值-该文件在沙特阿拉伯建筑业的背景下实现并确定了项目采购系统与MEP项目绩效之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号