首页> 外文期刊>Engineering Computations >Determination of cable forces in cable-stayed bridges constructed under parametric uncertainty
【24h】

Determination of cable forces in cable-stayed bridges constructed under parametric uncertainty

机译:参数不确定性下斜拉桥索力的确定

获取原文
获取原文并翻译 | 示例

摘要

Purpose - The existing methods for determining cable forces in cable-stayed bridges constructed are based on assumption of complete determinacy of structural parameters. This is usually referred to as deterministic analysis. But in reality there are uncertainties in design variables. These uncertainties include geometric properties (cross-sectional properties and dimensions), material mechanical properties (modulus and strength, etc), load magnitude and distribution, etc. Thus deterministic analysis cannot provide complete information regarding cable forces in cable-stayed bridges constructed. The purpose of this paper is to determine cable forces in cable-stayed bridges constructed under parametric uncertainty.rnDesign/methodology/approach - An efficient and accurate algorithm is proposed to determine the cable forces in cable-stayed bridges constructed under parameter uncertainty. The proposed method is a hybrid method, consisting of the improved Monte Carlo simulation method and forward process analysis method.rnFindings - The proposed algorithm can obtain more information about the cable forces at different construction stages than the commonly used deterministic method, and it provides an improved understanding of the cable forces in cable-stayed bridges constructed with parameter uncertainties. Originality/value - The values of this type of research are that: it developed an efficient and accurate algorithm for determining the cable forces in cable-stayed bridges constructed under parameter uncertainty; and it provided an improved understanding of the cable forces in cable-stayed bridges constructed with parameter uncertainties.
机译:目的-用于确定所建造斜拉桥中索力的现有方法是基于结构参数完全确定的假设。这通常称为确定性分析。但实际上,设计变量存在不确定性。这些不确定性包括几何特性(横截面特性和尺寸),材料机械特性(模量和强度等),载荷大小和分布等。因此,确定性分析不能提供有关所构造斜拉桥索力的完整信息。本文的目的是确定参数不确定性下斜拉桥的索力。设计/方法/方法-提出了一种有效,准确的算法来确定参数不确定性下斜拉桥的索力。所提出的方法是一种混合方法,由改进的蒙特卡洛模拟方法和正向过程分析方法组成。rn发现-与常用的确定性方法相比,所提出的算法可以在不同的施工阶段获得更多有关索力的信息,并提供了一种改进了对具有参数不确定性的斜拉桥索力的理解。原创性/价值-这类研究的价值在于:它开发了一种有效而准确的算法,用于确定在参数不确定性下建造的斜拉桥中的索力;从而可以更好地理解带有参数不确定性的斜拉桥的索力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号