...
首页> 外文期刊>Engineering Applications of Artificial Intelligence >A study of project scheduling optimization using Tabu Search algorithm
【24h】

A study of project scheduling optimization using Tabu Search algorithm

机译:基于禁忌搜索算法的项目进度优化研究

获取原文
获取原文并翻译 | 示例
           

摘要

The research will focus on investigating a more efficient alternative to solve resource-constrained project scheduling problems (RCPSP). Also, instead of using traditional Tabu Search (TS) algorithm and the other Artificial Intelligence (AI)-based heuristic approaches, this research develops an improved TS model by modifying the way of finding a starting solution instead of traditional TS algorithm to solve the problems described above. The model can effectively provide better results in reducing project duration for solving RCPSP compared to traditional TS-based search techniques and Artificial Intelligence (AI)-based approaches. The paper suggests the optimum parameters' setting values for the models the paper presented through sensitivity analysis to obtain better solution quality more easily. Also, the method the paper presented provides a good user interface linking with existing commercial software systems to help for the practitioner in the application of project management in the real world.
机译:该研究将集中于研究一种更有效的解决方案,以解决资源受限的项目计划问题(RCPSP)。此外,本研究没有使用传统的禁忌搜索(TS)算法和其他基于人工智能(AI)的启发式方法,而是通过修改寻找起始解决方案的方法(而不是传统的TS算法)来开发改进的TS模型。如上所述。与传统的基于TS的搜索技术和基于人工智能(AI)的方法相比,该模型可以有效地提供更好的结果,从而缩短解决RCPSP的项目工期。本文通过敏感性分析为本文提出的模型提供了最佳参数设置值,以更轻松地获得更好的解决方案质量。同样,本文介绍的方法提供了一个良好的用户界面,可与现有的商业软件系统链接,以帮助从业人员在现实世界中应用项目管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号