...
【24h】

Weather report

机译:天气预报

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the January 2003 report, we reviewed different options for locating a free cooling heat exchanger within a central plant. You may recall that the tower side of the cooling tower bypass control valve seemed to make the most sense because it essentially allows for dual condenser water temperature control. When in the free cooling diode, the towers operate to maintain cold water to the heat exchanger with the bypass valve closed. As a result, there is no circulation on the chiller side of the valve and the water temperature stays at room temperature. A chiller can then be started without delay when changing back to mechanical cooling. Alternatively, if the condenser water connection is on the chiller side of the bypass valve, a warm up period is required to raise the condenser water temperature to a reasonable level prior to starting a chiller.
机译:在2003年1月的报告中,我们审查了在中央工厂内安装自然冷却热交换器的不同选择。您可能还记得,冷却塔旁通控制阀的塔侧似乎最有意义,因为它实际上允许双重冷凝器水温控制。当处于自然冷却二极管中时,在旁通阀关闭的情况下,冷却塔可保持向热交换器提供冷水。结果,阀的冷却器侧没有循环,水温保持在室温。当回到机械冷却状态时,可以立即启动冷却器。或者,如果冷凝器水连接位于旁通阀的冷却器侧,则需要预热时间以将冷凝器水温度升高到启动冷却器之前的合理水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号