首页> 外文期刊>Engineered systems >Building Program Annual Operating Budget For A Office Space Tenant Retrofit Building Project
【24h】

Building Program Annual Operating Budget For A Office Space Tenant Retrofit Building Project

机译:办公空间租户改造建筑项目的建筑计划年度运营预算

获取原文
获取原文并翻译 | 示例
       

摘要

For a building program to be successful and sustainable, it is imperative that the program include an operating budget in addition to the construction budget. When it comes to tenants leasing space in a building, the O&M budget is usually budgeted in cost per sq ft and included in the annual lease fee. Fifteen to 20% of the cost of a building is first cost, so at least 80% of the cost to own a building is in the O&M of the building over its lifetime.
机译:为了使建筑计划成功且可持续,该计划必须包括建筑预算之外的运营预算。对于租户租用建筑物中的空间,O&M预算通常以每平方英尺的成本进行预算,并包含在年度租赁费中。建筑物成本的15%到20%是首次成本,因此拥有建筑物的成本中至少有80%在建筑物的整个生命周期内的运维成本中。

著录项

  • 来源
    《Engineered systems》 |2014年第10期|22-22|共1页
  • 作者

    Amanda Parolise;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号