...
首页> 外文期刊>Engineered systems >Preparing For And Completing A Construction Site Field Visit
【24h】

Preparing For And Completing A Construction Site Field Visit

机译:准备并完成施工现场实地考察

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Here are my suggestions for preparing to complete a construction administration site visit as the design engineer for the project. This is part two of a four-part discussion on the role of a design engineer when a project moves into the construction phase of work/fee. As always, the designer should prepare herself for the site visit by uploading specific documents to her laptop, tablet, or iPad. Before she does this, she should know the status of the HVAC installation by reading the latest trade contractor's weekly meeting minutes and reviewing the HVAC installation status by checking the project installation schedule. Also, call ahead to the project's mechanical-electrical coordinator to confirm the HVAC installation status, so that the trip out to the site is not wasted. Armed with this information, the designer should upload pertinent documents.
机译:这是我为准备完成该项目的设计工程师而进行的建筑管理现场访问的建议。这是有关项目进入工作/费用构建阶段时设计工程师的角色的四部分讨论的第二部分。与往常一样,设计师应通过将特定文档上载到她的笔记本电脑,平板电脑或iPad来为现场访问做好准备。在执行此操作之前,她应该通过阅读最新的贸易承包商的每周会议记录并通过检查项目安装时间表来查看HVAC安装状态,从而了解HVAC安装状态。另外,请提前致电项目的机电协调员以确认HVAC的安装状态,以免浪费前往现场的行程。掌握了这些信息后,设计人员应上载相关文档。

著录项

  • 来源
    《Engineered systems》 |2014年第1期|92-92|共1页
  • 作者

    Howard McKew;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号