...
首页> 外文期刊>Engineered systems >CRITICAL CENTRAL AIR-HANDLING STANDBY UNIT: OWNER IN-HOUSE PROJECT MANAGEMENT
【24h】

CRITICAL CENTRAL AIR-HANDLING STANDBY UNIT: OWNER IN-HOUSE PROJECT MANAGEMENT

机译:关键的中央空调待命单元:所有者内部项目管理

获取原文
获取原文并翻译 | 示例
           

摘要

This month's B2B will focus on a large pharmaceutical building that chose to invest in a standby secondary AHU (AH-6) to be ready in parallel with five other secondary central AHUs serving a 6,000-sq-ft Class 1,000 cleanroom space. Each existing unit is 40,000 cfm, and the new standby unit will be identical in configuration and size and serve to provide standby capacity should any one of the existing five units fail during operation. It will also serve when any of the other five units is scheduled for planned maintenance.
机译:本月的B2B将集中在一所大型制药大楼上,该大楼选择投资一个备用二级AHU(AH-6),以便与服务于6,000平方英尺1000级无尘室空间的其他五个二级中央AHU并行准备。现有的每个单元的容量为40,000 cfm,新的备用单元的配置和大小将相同,并且如果现有的五个单元中的任何一个在操作过程中发生故障,它都将提供备用容量。当计划对其他五个单元中的任何一个进行计划维护时,它也将起作用。

著录项

  • 来源
    《Engineered systems》 |2017年第5期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号