首页> 外文期刊>Engineered systems >CRITICAL CENTRAL AIR-HANDLING STANDBY UNIT: Owner In-House Project Management
【24h】

CRITICAL CENTRAL AIR-HANDLING STANDBY UNIT: Owner In-House Project Management

机译:关键的中央空调待命单元:业主内部项目管理

获取原文
获取原文并翻译 | 示例
           

摘要

This month's Facility File will focus on the B2B May test for an addition of a standby AHU in a pharmaceutical building HVAC application. It would be very beneficial for the owner's building facility manager and construction manager to read chapter 18, Clean Space facilities, in the 2015 ASHRAE Handbook -HVAC Applications to be knowledgeable of ASHRAE's guidelines when preparing for a building program that will involve work within a clean space and the design parameters associated with this type of application. In addition, the in-house project management team and AHU equipment manufacturer should also review the various guidelines published by the International Society of Pharmaceutical Engineering (ISPE).
机译:本月的Facility File将重点关注B2B May测试,以在制药建筑HVAC应用中添加备用AHU。业主的建筑设施经理和建筑经理阅读2015年ASHRAE手册-HVAC应用中的第18章“清洁空间设施”,在准备涉及清洁工作的建筑程序时,应了解ASHRAE的指南,这将非常有益。与此类应用程序相关的空间和设计参数。此外,内部项目管理团队和AHU设备制造商还应审查国际制药工程学会(ISPE)发布的各种指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号