首页> 外文期刊>Engineer >ENFORCE 2012 Working Groups and Panels
【24h】

ENFORCE 2012 Working Groups and Panels

机译:ENFORCE 2012工作组和小组

获取原文
获取原文并翻译 | 示例
           

摘要

Enforce 2012 working groups and panels were well-attended, content-rich events with powerful takeaways for everyone in the audience. Each working group and panel was led by experts in their fields and provided an opportunity for the Engineer Regiment to hear several knowledgeable people present information and discuss personal views. They were all great discussions that provided a better understanding of issues that are particularly relevant to engineering for the wars we fight.
机译:Enforce 2012工作组和小组是出席人数众多,内容丰富的活动,并为观众中的每个人提供了有力的宣传。每个工作组和小组均由各自领域的专家领导,为工程师团提供了一个机会,让他们有机会听到几个知识渊博的人介绍信息并讨论个人观点。这些都是很好的讨论,可以使人们更好地了解与我们为战争设计的工程特别相关的问题。

著录项

  • 来源
    《Engineer》 |2012年第mayaauga期|p.8-915|共3页
  • 作者

    Michael A. Dascanio;

  • 作者单位

    U.S. Army Engineer School Directorate of Training and Leader Development;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号