首页> 外文期刊>Engineer >IMPROVED RIBBON BRIDGE EMPLACEMENT IN COLD-WEATHER OPERATIONS
【24h】

IMPROVED RIBBON BRIDGE EMPLACEMENT IN COLD-WEATHER OPERATIONS

机译:在寒冷天气中改进的RIBBON桥安装

获取原文
获取原文并翻译 | 示例
           

摘要

Seventeen years had passed since the 1438th Multirole Bridge Company (MRBC) had conducted cold-weather bridging operations. As the unit prepared to conduct a 21-day annual training (AT) exercise, the frigid North Missouri winter crept in. Temperatures fell below freezing and remained there throughout the weeks preceding AT. These conditions led to significant ice accumulation on all bodies of water in the area of operations, creating an ice obstacle the likes of which the 1438th MRBC had never previously negotiated. Further complicating the situation was the external evaluation by First Army, which the 1438th needed to pass on the fourth day of AT.
机译:自从1438年的Multirole Bridge Company(MRBC)进行寒冷天气的桥接运营以来,已经过去了17年。由于该部队准备进行为期21天的年度训练(AT),因此严寒的北密苏里州冬季渐行渐远。温度降至冰点以下,并在AT之前的整个星期一直保持在那里。这些条件导致行动区域内所有水体上大量积冰,从而形成了冰障碍,而第1438 MRBC从未与之谈判过。使局势更加复杂的是第一军的外部评估,第1438军需要在AT的第四天通过评估。

著录项

  • 来源
    《Engineer》 |2018年第mayaauga期|42-45|共4页
  • 作者单位

    1438th MRBC, 1140th Engineer Battalion, 35th Engineer Brigade, Missouri National Guard;

    1438 MRBC;

    Missouri National Guard;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号