首页> 外文期刊>Energy >Development of a GHG-mitigation oriented inexact dynamic model for regional energy system management
【24h】

Development of a GHG-mitigation oriented inexact dynamic model for regional energy system management

机译:面向温室气体减排的不精确动态模型的开发用于区域能源系统管理

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Multiple dynamics and uncertainties are involved in regional energy and greenhouse gas management (REGM) system, confronting decision makers during plan/policy makings. In this study, a greenhouse gas (GHG)-mitigation oriented inexact dynamic energy system management model (IFMP-REGM) is developed for a REGM system. The IFMP-REGM is a hybrid methodology of interval mathematical programming, fuzzy linear programming and multi-stage stochastic programming. It can not only handle uncertainties presented as discrete intervals, fuzzy sets and probability distributions, but also reflect dynamic variations of system conditions, particularly for large-scale multistage problems with sequential structures. The uncertain information can be incorporated within a multi-layer scenario tree; revised decisions are permitted in each time period based on the realized values of the uncertain events. The developed IFMP-REGM model was then applied to a hypothetical regional energy and GHG management system. The results indicate that the IFMP-REGM can effectively address complexities of various system uncertainties as well as dealing with multi-stage stochastic decision problems within energy systems.
机译:区域能源和温室气体管理(REGM)系统涉及多种动态和不确定性,在计划/政策制定过程中面临决策者的挑战。在这项研究中,针对REGM系统开发了面向温室气体(GHG)缓解的不精确动态能源系统管理模型(IFMP-REGM)。 IFMP-REGM是区间数学规划,模糊线性规划和多阶段随机规划的混合方法。它不仅可以处理以离散区间,模糊集和概率分布表示的不确定性,而且还可以反映系统条件的动态变化,特别是对于具有顺序结构的大规模多阶段问题。不确定信息可以合并到多层方案树中。根据不确定事件的实现值,允许在每个时间段中进行修订的决策。然后将已开发的IFMP-REGM模型应用于假设的区域能源和温室气体管理系统。结果表明,IFMP-REGM可以有效地解决各种系统不确定性的复杂性,以及处理能源系统内的多阶段随机决策问题。

著录项

  • 来源
    《Energy》 |2011年第5期|p.3388-3398|共11页
  • 作者单位

    Faculty of Engineering and Applied Science, University of Regina, 3737 Wascana Parkway, Regina, Saskatchewan S4S 0A2, Canada;

    Faculty of Engineering and Applied Science, University of Regina, 3737 Wascana Parkway, Regina, Saskatchewan S4S 0A2, Canada;

    Center for Studies of Energy and Environment, University of Regina, Regina, S4S 7J7 Saskatchewan, Canada;

    Faculty of Engineering and Applied Science, University of Regina, 3737 Wascana Parkway, Regina, Saskatchewan S4S 0A2, Canada;

    Faculty of Engineering and Applied Science, University of Regina, 3737 Wascana Parkway, Regina, Saskatchewan S4S 0A2, Canada;

    Faculty of Engineering and Applied Science, University of Regina, 3737 Wascana Parkway, Regina, Saskatchewan S4S 0A2, Canada;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    greenhouse gas management energy system model uncertain fuzzy multi-stage;

    机译:温室气体管理能源系统模型不确定模糊多阶段;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号