首页> 外文期刊>Energy Engineering >Integration of a Process Waste Gas into A Site's Energy Concept
【24h】

Integration of a Process Waste Gas into A Site's Energy Concept

机译:将过程废气整合到站点的能源概念中

获取原文
获取原文并翻译 | 示例
       

摘要

In 1996, the BASF Corporation's Geismar, Louisiana, site deter- mined that the increased steam demands of their aggressive investment program would require them to expand their steam generation capacity. The site had operated a gas turbine based generation system since 1985 so they naturally reviewed the economics of another such installa- tion. At the same time, a new acetylene plant was being planned, which generated a large process waste gas stream. Conceptual studies indi- cated that integrating the two projects would provide significant eco- nomic advantages.
机译:1996年,巴斯夫公司在路易斯安那州的Geismar基地确定,其积极的投资计划对蒸汽的需求不断增加,这将要求他们扩大蒸汽的生产能力。该站点自1985年以来就一直运行基于燃气轮机的发电系统,因此他们自然地回顾了另一套此类设备的经济性。同时,正在计划建设一座新的乙炔装置,该装置将产生大量的工艺废气流。概念研究表明,将两个项目整合在一起将提供显着的经济优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号