首页> 外文期刊>Energy Engineering >The Importance of Properly Setting the Baseline for Performance Contracts
【24h】

The Importance of Properly Setting the Baseline for Performance Contracts

机译:正确设定履约合同基准的重要性

获取原文
获取原文并翻译 | 示例
       

摘要

Measurement and verification for performance contracting is necessary to verify the achieved savings. In some cases, verified savings is required in order to repay the capital investment for the project. One key, but often overlooked, element is the establishment of the baseline to be used. In a lot of performance contacting projects, actual construc- tion of the energy project becomes paramount to all parties, and a base- line becomes a neglected or secondary element. Because the project typi- cally requires replacement of old, inefficient equipment, establishment of a baseline after completion of the project is virtually impossible. This article will discuss the importance of properly establishing a baseline for PC projects, including acceptance by all parties.
机译:必须对绩效合同进行衡量和验证,以验证所实现的节省。在某些情况下,需要经过验证的节约才能偿还该项目的资本投资。一个关键但经常被忽略的要素是要使用的基准的建立。在许多与绩效有关的项目中,能源项目的实际建设对各方至关重要,而基线则成为被忽略或次要的因素。由于该项目通常需要更换旧的,效率低下的设备,因此在项目完成后几乎不可能建立基准。本文将讨论为PC项目正确建立基准的重要性,包括所有各方的认可。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号