首页> 外文期刊>Energy Engineering >Commissioning of a LEED-EB Gold Certified Office Building
【24h】

Commissioning of a LEED-EB Gold Certified Office Building

机译:LEED-EB金牌认证办公大楼的调试

获取原文
获取原文并翻译 | 示例
       

摘要

A 320,000-square-foot class A high-rise office building in Nashville, TN, achieved LEED-EB Gold Certification. LEED-EB version 2.0 was utilized, which requires retro-commissioning (RCx) as a prerequisite for certification. SSRCx performed the RCx services during the LEED-EB performance period and was contracted after building certification to utilize the Continuous Commissioning~(R) (CC~(R))~* process to seek additional energy savings. The building was constructed in 1999 as a core and shell project, and build-outs were done through 2001. By January 2008, a single company managed and occupied the facility. This article describes the RCx process for LEED-EB v2.0 and the CC process after LEED certification. Findings and implementation strategies for energy savings are presented for both processes.
机译:田纳西州纳什维尔市的一栋320,000平方英尺的A级高层办公大楼获得了LEED-EB金牌认证。使用了LEED-EB 2.0版,它要求进行调试(RCx)作为认证的先决条件。 SSRCx在LEED-EB执行期间进行了RCx服务,并在获得建筑认证后签定了合同,以利用持续调试(R)(CC〜)过程来寻求更多的节能效果。该建筑于1999年作为核心和外壳项目而建,直到2001年才进行扩建。到2008年1月,一家公司管理并占用了该设施。本文介绍LEED-EB v2.0的RCx流程以及LEED认证后的CC流程。提出了两个过程的节能结果和实施策略。

著录项

  • 来源
    《Energy Engineering》 |2011年第1期|p.42-54|共13页
  • 作者

    Paul McCown;

  • 作者单位

    Sr. Mechanical Engineer SSRCx, LLC;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:27:34

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号