The Power Plants Generation Planning (PPGP) usually encountered complicated problems. In this paper, a new hierarchical approach is applied for generation planning in power plants. In hierarchical approach, the main integrated problem is separated into some sub problems which could be easily solved by multi level models. Higher level models include organization total strategy and lower level models is concerned with detailed accurate planning. When models are broken down into several levels, the solutions of higher level could be considered as inputs for the lower levels. In the proposed structure, amount of future demand is predicted to specify time periods in first level. In the second level, amount of demand for each aggregate period is allocated to different aggregate methods of electricity generation like; steam, gas, combined cycle and hydro power plants in Iran by using Analytical Hierarchy Process (AHP) and Fuzzy Aggregate Production Planning (FAPP). This allocation is carried out according to two criteria of "share of total electricity generated by each type of generation" and "amount of environmental pollution". AHP and Fuzzy Disaggregate Production Planning (FDAPP) are applied to determine best utilizing power plants for generation in the final level. The proposed Fuzzy Hierarchical Production Planning (FHPP) outputs express optimal combination of power plants which contribute for demand satisfaction.
机译:电厂发电计划(PPGP)通常遇到复杂的问题。本文将一种新的分层方法应用于发电厂的发电计划。在分层方法中,主要的集成问题被分为一些子问题,这些子问题可以通过多级模型轻松解决。较高级别的模型包括组织的总体策略,而较低级别的模型则涉及详细的准确计划。当模型分为几个级别时,较高级别的解决方案可以视为较低级别的输入。在建议的结构中,预计未来需求量将在第一级指定时间段。在第二级中,每个汇总时段的需求量分配给不同的汇总发电方式,例如:通过使用层次分析法(AHP)和模糊综合生产计划(FAPP)来在伊朗的蒸汽,天然气,联合循环和水力发电厂。该分配根据“每种发电所产生的总电量的份额”和“环境污染量”两个标准进行。层次分析法(AHP)和模糊分解生产计划(FDAPP)用于确定最终水平的发电最佳利用电厂。拟议的模糊层次生产计划(FHPP)输出表示发电厂的最佳组合,这有助于满足需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号