首页> 外文期刊>Energy Conversion & Management >Flexible fault ride through strategy for wind farm clusters in power systems with high wind power penetration
【24h】

Flexible fault ride through strategy for wind farm clusters in power systems with high wind power penetration

机译:高风能渗透力的电力系统中的风电场群的灵活故障穿越策略

获取原文
获取原文并翻译 | 示例
           

摘要

This paper investigates a flexible fault ride through strategy for power systems in China with high wind power penetration. The strategy comprises of adaptive fault ride through requirements and maximum power restrictions of the wind farms with weak fault ride through capabilities. The slight faults arid moderate faults with high probability are the main defending objective of the strategy. The adaptive fault ride through requirement in the strategy consists of two sub fault ride through requirements, a temporary slight voltage ride through requirement corresponding to a slight fault incident, with a moderate voltage ride through requirement corresponding to a moderate fault. The temporary overloading capability of the wind farm is reflected in both requirements to enhance the capability to defend slight faults and to avoid tripping when the crowbar is disconnected after moderate faults are cleared. For those wind farms that cannot meet the adaptive fault ride through requirement, restrictions are put on the maximum power output. Simulation results show that the flexible fault ride through strategy increases the fault ride through capability of the wind farm clusters and reduces the wind power curtailment during faults. (C) 2015 Elsevier Ltd. All rights reserved.
机译:本文研究了具有较高风电渗透率的中国电力系统的灵活故障穿越策略。该策略包括自适应故障穿越要求和具有弱故障穿越能力的风电场的最大功率限制。该策略的主要防御目标是轻微故障和中等故障。策略中的自适应故障穿越要求包括两个子故障穿越要求,与轻微故障事件相对应的临时轻微电压穿越要求,与中等故障相对应的中等电压穿越要求。风电场的临时过载能力体现在两个要求中,即增强了防御轻微故障的能力,并避免了在清除中度故障后断开撬杠断开时的跳闸。对于那些不能满足自适应故障穿越要求的风电场,对最大功率输出进行了限制。仿真结果表明,灵活的故障穿越策略提高了风电场群的故障穿越能力,并减少了故障期间的风电削减。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

  • 来源
    《Energy Conversion & Management》 |2015年第3期|239-248|共10页
  • 作者单位

    Harbin Inst Technol, Postdoctoral Res Stn Power Engn & Engn Thermalphy, Harbin 150006, Peoples R China|Harbin Inst Technol, Sch Elect Engn & Automat, Harbin 150006, Peoples R China;

    China Elect Power Res Inst, Nanjing, Jiangsu, Peoples R China;

    Harbin Inst Technol, Postdoctoral Res Stn Power Engn & Engn Thermalphy, Harbin 150006, Peoples R China;

    Queens Univ Belfast, Sch Mech & Aerosp Engn, Belfast BT7 1NN, Antrim, North Ireland;

    China Elect Power Res Inst, Nanjing, Jiangsu, Peoples R China;

    Queens Univ Belfast, Sch Elect Elect Engn & Comp Sci, Belfast BT7 1NN, Antrim, North Ireland;

    Harbin Inst Technol, Sch Elect Engn & Automat, Harbin 150006, Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Wind power; Fault analysis; Cascading trip; Fault ride through; Grid code;

    机译:风力;故障分析;级联行程;故障穿越;电网规范;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号