首页> 外文期刊>Energy and Buildings >Energy-saving scheduling optimization under up-peak traffic for group elevator system in building
【24h】

Energy-saving scheduling optimization under up-peak traffic for group elevator system in building

机译:建筑群电梯系统高峰流量下的节能调度优化

获取原文
获取原文并翻译 | 示例
       

摘要

Energy-saving group scheduling is a significant challenge for multi-elevator system in building. Among various traffic patterns in building, most energy is consumed under up-peak traffic pattern. To save unnecessary energy consumption and realize optimal scheduling, an energy-saving scheduling optimization method for up-peak pattern is proposed. The optimization objective is minimizing the scheduling energy price of the group system. The up-peak energy price function is defined first, both of picking and traveling energy are considered in it. Based on that, scheduling Robust Optimization model is built to handle elevator scheduling under uncertain up-peak traffic flow. The key point of optimization is a dual energy-saving mechanism. One is adaptive configuration, choosing fewer but enough number's elevator to transport waiting passengers on the lobby floor. Another is optimization selection, choosing which elevators to serve according to minimum energy price after the number of dispatched elevators is decided. In practice, elevators in group system are dispatched by scheduling decision of the optimization to realize system energy-saving operation under up-peak pattern. In simulation, compared with the scheduling performances of other algorithms under different up-peak flows in several buildings, effectiveness of the method proposed is verified.
机译:节能分组调度是建筑物中多电梯系统的重大挑战。在建筑物的各种交通方式中,大部分能量是在高峰交通方式下消耗的。为了节省不必要的能耗并实现最优调度,提出了一种高峰模式的节能调度优化方法。优化目标是使组系统的调度能源价格最小化。首先定义了高峰能源价格函数,其中同时考虑了采摘和行驶能源。在此基础上,建立了调度鲁棒优化模型来处理不确定的高峰交通流量下的电梯调度。优化的关键是双重节能机制。一种是自适应配置,选择较少但数量足够多的电梯在大厅楼层上运送等待的乘客。另一个是优化选择,在确定已调度的电梯数量之后,根据最低能源价格选择要使用的电梯。在实践中,通过优化调度决策来调度群系统中的电梯,以实现高峰模式下的系统节能运行。在仿真中,与其他算法在几座建筑物在不同的高峰流量下的调度性能进行了比较,验证了所提方法的有效性。

著录项

  • 来源
    《Energy and Buildings》 |2013年第11期|495-504|共10页
  • 作者

    Jinglong Zhang; Qun Zong;

  • 作者单位

    College of Electric Engineering and Automation, Tianjin University, Tianjin 300072, China;

    College of Electric Engineering and Automation, Tianjin University, Tianjin 300072, China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Croup elevator system; Energy-saving; Scheduling optimization; Up-peak;

    机译:副电梯系统;节能;调度优化;高峰期;
  • 入库时间 2022-08-18 00:09:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号