1. Mount the elevator interface box on wall in elevator control room, 2. Provide 120 VAC to the interface box. 3. Install conduit between the elevator interface and the elevator control. (This will most likely be done by the elevator company.) 4. Modify the elevator control. (This opera-tion must be performed by the elevator maintenance company.) 5. Install AC outlets for radio communications systems. A duplex outlet is required for each radio. 6. Run cable from inside the elevator interface to the primary radio (the radio closest to the interface). Leave an extra 10 feet of cable on both ends. 7. Complete the elevator test procedure and notify the robot manufacturer.
机译:1.将电梯接口盒安装在电梯控制室的墙上,2.为接口盒提供120 VAC。 3.在电梯接口和电梯控制器之间安装导管。 (这很可能由电梯公司完成。)4.修改电梯控制。 (此操作必须由电梯维修公司执行。)5.安装无线电通信系统的交流电源插座。每个无线电都需要一个双工插座。 6.将电缆从电梯接口内部连接到主无线电(最靠近该接口的无线电)。在两端留出10英尺的额外电缆。 7.完成电梯测试程序,并通知机器人制造商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号