...
首页> 外文期刊>Electronics Today >Airtel installs 100 kw solar plant to power centre in Lucknow
【24h】

Airtel installs 100 kw solar plant to power centre in Lucknow

机译:Airtel在勒克瑙的电力中心安装了100千瓦太阳能发电厂

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Telecom operator Bharti Airtel announced it has installed a 100 kw solar power plant at Gangaganj in Lucknow, which would help save 26,000 litres of die-sel per year consumed to power its major routing centre. This location is one of the major switching and routing centre, which processes the voice and data traffic for the telecom operator.the company said in a statement. The company is planning to replicate similar power plants in six other locations generating close to 300 KWp of solar energy, the statement added.
机译:电信运营商Bharti Airtel宣布已在勒克瑙的Gangaganj安装了一个100千瓦的太阳能发电厂,这将帮助每年节省为其主要路由中心供电的26,000升裸片。该公司在一份声明中说,该地点是主要的交换和路由中心之一,为电信运营商处理语音和数据流量。声明补充说,该公司计划在其他六个地方复制类似的发电厂,产生接近300 KWp的太阳能。

著录项

  • 来源
    《Electronics Today》 |2013年第7期|50-50|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号