...
首页> 外文期刊>Electronics & communication engineering journal >TAIPEI AIRPORT LINK DUE IN FIVE YEARS
【24h】

TAIPEI AIRPORT LINK DUE IN FIVE YEARS

机译:台北机场通航五年

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Taiwan's Bureau of High Speed Rail says construction of a 65km railway linking the capital, Taipei, to Taoyuan International Airport will be completed in August 2014, Passenger services will begin two months later.rnThe line will have 22 stations, 15 of themrnelevated and seven underground.rnBureau spokesman Charles Chen said four tunnels will have to be drilled under the airport. "Protective measures are being taken to ensure that safety of the runways and the control tower is not compromised," Chen said.
机译:台湾高铁局表示,连接首都台北和桃园国际机场的65公里铁路建设将于2014年8月竣工,两个月后开始提供客运服务。该线将有22个车站,其中15个地铁站和7个地下地铁站.rnBureau发言人查尔斯·陈(Charles Chen)说,机场下方必须钻四个隧道。陈说:“正在采取保护措施,以确保不损害跑道和控制塔的安全。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号