首页> 外文期刊>Electrical India >Clover Solar to commission solar power plant under JNNSM
【24h】

Clover Solar to commission solar power plant under JNNSM

机译:三叶草太阳能公司将根据JNNSM委托建设太阳能发电厂

获取原文
获取原文并翻译 | 示例
           

摘要

Clover Solar Pvt Ltd, a group company of Clover Technologies Pvt Ltd, is first to commission a 2.2 MW Solar PV Power Plant in Supa, Baramati, Maharashtra before the deadline given by Government under JNNM (Jawaharlal Nehru National Solar Mission). Set up at an investment of Rs 40 crores, the plant spreads over 24 acres of land will generate more than 4 million units (kwh) of power per annum. Clover Solar was one among just 16 companies in India and 3 in Maharashtra who won contracts under the Gol's JNNSM. JNNM aims to encourage solar power generation and achieve coal power grid parity by 2030.
机译:Clover Technologies Pvt Ltd的子公司Clover Solar Pvt Ltd,是在政府根据JNNM(贾瓦哈拉尔·尼赫鲁国家太阳能使团)规定的截止日期之前,首次在马哈拉施特拉邦巴拉帕特的Supa调试一座2.2兆瓦太阳能光伏电站。该工厂投资4亿卢比,占地24英亩,年发电量超过400万单位。三叶草太阳能公司是印度仅有的16家公司之一,在马哈拉施特拉邦中只有3家公司赢得了Gol的JNNSM合同。 JNNM的目标是在2030年之前鼓励太阳能发电并实现煤电平价。

著录项

  • 来源
    《Electrical India》 |2011年第11期|p.26|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号