Prefabricated Substation

机译:预制变电站

获取原文
获取原文并翻译 | 示例
           

摘要

In any process or chemical plant, refinery or petrochemical complex, power station or large industrial installation, certain activities are time consuming and are on critical path. Completion of such activities in time is critical for overall project schedule. Civil works for main receiving substation or large substations is one such activity on critical path as overall commissioning schedule of plant depends on timely completion of substation work. Conventional substation building is an RCC or masonry brick construction and equipment such as switchboard and panels are housed inside it. This requires lot of co-ordination between electrical and civil discipline at the design stage.
机译:在任何过程或化工厂,炼油厂或石化厂,电站或大型工业设施中,某些活动都是耗时的,并且处于关键路径上。及时完成此类活动对于整个项目进度至关重要。主接收变电站或大型变电站的土建工程是关键路径上的一项活动,因为工厂的总体调试时间表取决于变电站工作的及时完成。常规的变电站建筑是RCC或砖砌建筑,其内部装有配电盘和面板等设备。这要求在设计阶段在电气和民用学科之间进行大量协调。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号