Symposium on operation of the Boulder Dam transmission line — Corona experience on transmission line

机译:博尔德大坝输电线路运行研讨会—输电线路的电晕经验

获取原文
获取原文并翻译 | 示例
           

摘要

THE original basis for the selection of 1.4 inches as the diameter of the conductor for the Boulder Dam transmission line was provided principally by test data taken at the Ryan High Voltage Laboratory, at Stanford University, by the Department of Water and Power in co-operation with Doctor Joseph S. Carroll, on conductors ranging from 1.125 inches to 2 inches in diameter.1 Also reference was made to other previous corona work at the same place.2,3,4 An analysis and use of the data,5,6 taking into account temperature and altitude effect and making some allowance for unknown factors affecting corona laws that had appeared in many of the tests, led to the final recommendation of 1.4 inches as the diameter for the conductor for 287.5 kv.
机译:选择1.4英寸作为Boulder Dam输电线路的导体直径的最初依据主要是由水和电力部在斯坦福大学瑞安高压实验室获得的测试数据提供的与Dr. Joseph S. Carroll一起,导体直径范围为1.125英寸至2英寸。 1 还参考了以前在同一位置进行的其他电晕工作。 2,3,4 < / sup>对数据的分析和使用, 5,6 ,考虑了温度和海拔高度的影响,并对许多测试中出现的影响电晕定律的未知因素进行了一些考虑,从而导致最终建议的导体直径为1.4英寸,为287.5 kv。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号